Jensen Huang Denies Vera Rubin Delay
firstadopter · x · 2026-07-15
Speaking in Tokyo, Jensen Huang stated that the Vera Rubin hardware is already in production and will see "massive volume," denying a SemiAnalysis report from this month claiming that the next-generation AI server rack system was delayed due to manufacturing difficulties with specialized circuit boards.
This is a direct statement regarding the mass production pace of Nvidia's next-gen AI server/rack system. The core message is: the delay rumors are false, and production is already underway.
More from Infra
- oMLX 0.5.2 adds Mac menu-bar stats, low-bit decode kernels, and faster downloads — awnihannun · 2026-07-22
- Strangeworks launches Aura to turn enterprise ops into production optimization systems — whurley · 2026-07-22
- Graph workload 854.graph500 enters SPEC CPU 2026 as a new CPU benchmark — Prof_DavidBader · 2026-07-22
- Hybrid and local inference are emerging as a response to AI energy and token costs — dmitry140 · 2026-07-22
- NVIDIA details Vera CPU with 2x performance claims and a 22,000-core rack — ryanshrout · 2026-07-22
- NVIDIA says Vera Rubin NVL72 delivers 10x more tokens per megawatt than Blackwell — nvidia · 2026-07-22