Testing the RL hypothesis with METR data: AI speedup started ~4 months before Mythos

austinc3301 · x · 2026-11-10

Independent re-analysis of METR's Nov 2026 AECI data testing Cohen's RL hypothesis: the larger pretrain (Mythos) only arrived in Feb 2026, so if it drove the capability speedup, acceleration should start then. But a fit allowing a one-time jump puts the start at Oct 2025 — 4 months earlier (85% likely within METR's error bars) — suggesting the bigger pretrain alone doesn't explain the speedup. Chart shows both fits, with Opus 4.6 landing just after the detected acceleration onset.

Related event: Independent Test: AI Acceleration Predates Mythos by Four Months(2 posts)→

Original post →

More from AGI Musings

AGI Musings channel →