Investor Predicts EDA/CAD Will Collapse Into One Flow Within 3-5 Years

ai · x · 2026-09-25

Flux CEO Matthias Wagner argues engineering silos are collapsing into one design interface; investor Kevin Gubbi adds that in 3-5 years EDA/CAD will become one continuous flow — chip, package, PCB, firmware and mechanical as a single system design problem — until taping out a chip feels as easy as connecting an MCP tool.

Original post →

More from Infra

Infra channel →