Nvidia supplier Wistron opens $700 million Texas plant for GB300 and Vera Rubin systems
Beth_Kindig · x · 2026-07-27
Wistron, a Nvidia supplier, has opened a $700 million Texas factory that will produce Nvidia’s GB300 systems and upcoming Vera Rubin racks.
Nvidia says the plant is ramping to make tens of thousands of boards per month, signaling continued expansion of its AI server supply chain in the U.S.
More from Infra
- Triton backend pushes Falcon3-10B to 97.5 tok/s on an RTX 5070 — OCV_Researcher · 2026-07-27
- Sparrow switches its Standard mode to Ministral 3 14B for local document extraction — andrejusb · 2026-07-27
- BeeLlama.cpp v0.4.1 adds KV-cache precision tails and new quantization modes — Anbeeld · 2026-07-27
- Running 100 million tokens through GLM 5.2 NVFP4 locally costs about $1 — _akhaliq · 2026-07-27
- Cloudflare’s AI-training block can also stop Googlebot after September 15 — daluoseo · 2026-07-27
- Self-hosted proxy unifies 424 AI models behind one OpenAI-compatible endpoint — ranadheer535 · 2026-07-27