Meta Data Center Wastewater Incident

AryHHAry · x · 2026-07-09

This post details a wastewater treatment issue during the construction of Meta's data center in Cheyenne, Wyoming. After cleaning the cooling pipes, contractors discharged the fluid into the city's sewer system, which subsequently led to bacteria being discovered in the reclaimed water.

Related event: Meta Data Center Construction Contaminates Local Water System(4 posts)→

Original post →

More from Infra

Infra channel →