Meta Data Center Construction Contaminates Local Water System

Meta's $800 million data center in Cheyenne contaminated the local water system after contractors flushed cooling pipes during construction, introducing rare bacteria into the recycled water used for irrigation.

2026-07-08 ~ 2026-07-09 · 4 related posts