SpaceX built a major AI data center with its own 750 MW gas plant in 83 days
DimaZeniuk · x · 2026-11-28
Aerial before/after photos show SpaceX turned a bare 444-acre Texas site into a major AI data center with its own 750 MW gas plant in just 83 days (Sep 4 to Nov 26), with multiple large buildings and rows of equipment already in place.
Related event: SpaceX Builds Massive AI Data Center in Texas in 83 Days(2 posts)→
More from Infra
- Texas lifts freeze on more than 1,800 data center projects — Polymarket · 2026-11-28
- Running the 24.9B Ming-Image 0.2 Design model on a 16GB Mac — MLX Q4/Q8 weights released — Puzzleheaded_Note739 · 2026-11-28
- DeepSeek V4.1 Flash on DGX Spark: 22 to 40 tok/s with SSD expert streaming — AIFlow_ML · 2026-11-28
- Sequent open-sources executable A64 ISA semantics in HOL4 with conformance suite — jedisct1 · 2026-11-28
- DAWIN paper: continuous-time neuron primitive speeds inference up to 2630x on B200, beats Neural CDE — Byunggu Yu · 2026-11-28
- A solo builder's home AGI stack: local LLMs, Japanese practice, and a privacy-first family assistant — catplusplusok · 2026-11-28