SpaceX built a major AI data center with its own 750 MW gas plant in 83 days

DimaZeniuk · x · 2026-11-28

Aerial before/after photos show SpaceX turned a bare 444-acre Texas site into a major AI data center with its own 750 MW gas plant in just 83 days (Sep 4 to Nov 26), with multiple large buildings and rows of equipment already in place.

Related event: SpaceX Builds Massive AI Data Center in Texas in 83 Days(2 posts)→

Original post →

More from Infra

Infra channel →