Tesla AI5 pushed to 2028 as TSMC 3nm capacity goes to Google and Microsoft first
AIFlow_ML · x · 2026-11-27
Per a Taiwan supply-chain report (Commercial Times), GUC — Tesla's ASIC design partner for the AI5 chip — is prioritizing TSMC's limited 3nm (N3) capacity for Google's Axion 2/3 server processors and Microsoft's in-house chips, thanks to their higher-margin datacenter orders. As a result, large-scale AI5 rollout in Tesla vehicles is pushed back to 2028.
Key points:
- Tesla shipped FSD v15, using a Universal Visual Encoder (UVE) and flow-matching algorithms to deliver "Reality View" on the existing AI4 platform, buying time for the hardware upgrade.
- Musk says production EVs stay on AI4/AI4.5; next-gen AI5 goes first to Optimus humanoids and datacenters.
- GUC's 2027 N3 allocation grows sharply but still can't serve everyone; limited AI5 capacity will supply the smaller-volume, compute-hungry Optimus first to accumulate production experience.
- Poster's take: owning the chip design doesn't get you wafers — Tesla still queues behind Google and Microsoft.
More from Companies & People
- OpenClaw's ClawCon Shenzhen set for Dec 4-6, expecting ~1,000 attendees — vincent_koc · 2026-11-27
- Reddit user slams OpenAI's usage-count 'slip-up': fabrication or billion-dollar leak? — Next_Technology6361 · 2026-11-27
- tszzl: Anthropic's sealed debate culture is a strategic advantage OpenAI lacks — tszzl · 2026-11-27
- China tech briefing: Nvidia halts Southeast Asia chip shipments, SAP cuts 10,000 jobs for AI pivot — 创业邦 · 2026-11-27
- Hinton rebuts Huang on extinction risk; OpenAI admits GPT-6.2 billing error; China drafts AI data rules — APPSO · 2026-11-27
- Mac App of the Year finalists spark debate: native desktop apps peaked a decade ago — zetalyrae · 2026-11-27