METR chart misread: at 80% success rate AI task-horizon progress slows, timelines stretch a decade
GaryMarcus · x · 2026-11-27
- Gary Marcus reshares Ramez Naam's caveat on the new METR graph: the plotted trend reflects 50% success-rate task horizons. At 80% success, models improve more slowly, and extrapolating that slower pace pushes reliable long-task AI timelines out by a decade or more.
- The attached chart (Naam, built with ChatGPT) projects four reliability tiers assuming the Epoch Capabilities Index gains 18.9 points/year: 80% success doubles every 5.6 months (reaching 15.1-yr tasks by Oct 2035), 90% every 7.5 months (70.3 days), 95% every 10 months (2.6 days), 98% every 14.6 months (just 2.4 hours).
- Quoted @mentalgeorge corrects a widespread misreading: METR's two slopes are "costly" vs "cheap" — the estimated cost of turning tasks into RL environments — not verifiable vs non-verifiable. Most tasks in the costly family (e.g. Slay the Spire: high token spend, easy to verify) are actually verifiable.
More from AGI Musings
- lpachter on AI math: just "the convex hull of existing mathematics" — lpachter · 2026-11-27
- Embodied models now "get" 3D space, commoditizing a decade of system integration — Sethwinterroth · 2026-11-27
- Sébastien Bubeck: releasing AI math results shows the world AI's rate of progress — minilek · 2026-11-27
- 17 million lines of Lean: mathematicians blast AI-assisted Riemann proof route as 'awful' — GaryMarcus · 2026-11-27
- "GTA 6 will be the last major human-made game" — one X user's AI prediction — imjustnewatai · 2026-11-27
- Rumor: OpenAI researcher proposes new quantum gravity theory built with GPT-6 Astra — Polymarket · 2026-11-27