SK hynix targets 3D DRAM mass production by 2031, first product at 100 layers
zephyr_z9 · x · 2026-11-25
At an AI semiconductor forum at Seoul National University, SK hynix Distinguished Engineer said the company aims to mass-produce 3D DRAM within 4-5 years, around 2031. Matching today's 10nm-class DRAM density requires 75 stacked cell layers, so the first product will start at 100 layers. Current equipment handles 100 layers; 200-300+ needs dedicated tools, and long-term the company will explore multi-deck stacking and hybrid bonding toward 1,000+ layers. SK hynix has built test cells with refresh characteristics comparable to conventional DRAM, and is researching selector structures, etch-process integration for cost, and IGZO channels to cut leakage. An unconfirmed note claims CXMT will move earlier, starting with a 64-layer 3D DRAM product.
More from Infra
- Standard HBM Prices Seen Falling ~20% in 2028 as Power Bottlenecks Delay Data Centers — tengyanAI · 2026-11-25
- CI benchmark: Blacksmith posts 616k/426k 4k random r/w IOPS, crushing GitHub and rivals — DanielLockyer · 2026-11-25
- OpenAI disbands robot team again as lab success hits 89% but long-horizon chores stall at 12% — 量子位 · 2026-11-25
- Chinese startup pulls General Looped Model report days after release; 75B params rivals 3T — 量子位 · 2026-11-25
- Samsung invests €210M to become largest shareholder of ams OSRAM — zephyr_z9 · 2026-11-25
- Groundbox fixes disk bottleneck after runnersbench test, Redis builds drop from 43s to 23s — DanielLockyer · 2026-11-25