The G1-D task in detail: grabbing misaligned, flipped parts before the conveyor advances

jb_mouret · x · 2026-11-24

jbmouret details the exact task from the Novares demo: the machine drops 4 parts per shot onto a conveyor, poorly aligned with every other row turned 180°, and the robot must grasp each part before the conveyor advances and place it in a container. Operators on this line had been doing the job by hand.

Related event: Unitree G1-D Learns Factory Packing in 12 Demos, Trains in 5 Minutes on Real Line(5 posts)→

Original post →

More from Embodied

Embodied channel →