Musk details Terafab: 100M sq ft fab targeting first test chip by June 2027

FuSheng_0306 · x · 2026-11-19

Recapping Musk's interview: Terafab aims to be the largest chip manufacturing facility on Earth, with a final footprint target of about 100 million square feet (9.3M square meters). The first test chip is targeted for around June 2027, with first-phase volume production pointing to late 2028 — Musk is cautiously optimistic.

On autonomy, Robotaxi will expand to other major Texas cities then Florida, with California approval hoped for in early 2027 but not guaranteed. Cybercab's rollout will stay deliberately cautious: with no steering wheel or pedals there's no fallback, and one serious crash could get the whole project halted by regulators. He also envisions Optimus as a household robot for tutoring, childcare, lawn mowing, and cooking.

Original post →

More from Embodied

Embodied channel →