Netherlands builds giant battery from 320 Tesla Megapacks, powering a region for 20 days
Yamapama · x · 2026-11-18
The Netherlands is building a giant battery storage facility from 320 Tesla Megapacks at GIGA Leopard in Delfzijl, with the first units now in place. It will store 1,200 MWh with 300 MW of power, built on a former aluminum smelter site to absorb excess offshore wind and solar power. Full operation is expected by the end of 2027, enough to power an entire region for about 20 days.
More from Infra
- Deep dive: the full rise and fall of DEC's Alpha processor architecture — ArtificialOther · 2026-11-18
- Nightmare Mobile Runs FLUX, Qwen Image and Wan 2.2 Fully Offline on Phone NPUs — Few_Caregiver8134 · 2026-11-18
- Free online book: LLM Inference Handbook for production deployment — burkov · 2026-11-18
- SEC opens civil probe into Nvidia over undisclosed China-linked chip sales — The Decoder · 2026-11-18
- Open-source LLM Optimization Handbook: 48 topics with hands-on quantization, KV cache and kernel problems — udmrzn · 2026-11-18
- One HF Job, $127 total: Inkling-2-Small image generation under a tenth of a cent per picture — vanstriendaniel · 2026-11-18