Fact-checking the NVDA FUD: unopened Indonesia racks, $758B 2028 capex still intact
basedjensen · x · 2026-11-17
Responding point-by-point to a viral bearish thread on Nvidia, the author argues nearly every claim collapses against primary sources:
- The Indonesia Megaspeed racks were still shrink-wrapped in early 2026 at a site launching in 2027; zero GPUs were ever delivered there.
- Today's BIS rule itself confirms remote cloud rentals were not previously covered under physical-shipment export rules.
- Even after SemiAnalysis's 28% cut, 2028 AI accelerator capex still sits at $758B/year — hardly a peak.
- Treasury has no legal authority over a Delaware board under DGCL 141.
The author calls the thread "textbook peak-FUD capitulation."
More from Venture
- Corma raises $125M at $1B valuation as study finds models plant backdoors in 85% of runs — rohanpaul_ai · 2026-11-17
- The 2020s as the frontier tech decade: crypto gave way to AI, robotics next — devanshmehta · 2026-11-17
- Indie dev's one-year build-in-public report: 54K audience, $20K+ revenue, only $257 from ads — jackedAJ · 2026-11-17
- India's sovereign AI lab Sarvam slammed for mostly hosting Chinese models — itsOmSarraf_ · 2026-11-17
- Vibe-coded AI game Slotbound makes $356k in 48 hours from a first-time dev — tetsuoai · 2026-11-17
- Italian startup Mosaico raises €7.5M to fix robotics data for physical AI — lukas_m_ziegler · 2026-11-17