Polymarket: 90% odds a US state enacts data center moratorium by 2027 after Maryland blocks $5B project
Polymarket · x · 2026-11-10
Polymarket's market on any US state enacting a data center moratorium trades at 90% Yes by end of 2027 (34% by 2026; 25% this year). Context: a Maryland activist gathered 25,000+ signatures to block a $5B AI data center planned at an abandoned mall closed 24 years ago. Market rules count only state-level legislation (including class-based bans by power/water/size thresholds), not tax-incentive suspensions or local ordinances.
Related event: Maryland activists gather 25,000 signatures to halt $5B AI data center(2 posts)→
More from Infra
- RBA gives LLaVA-OneVision-2 a 3x lossless training speed-up, merged upstream — liuziwei7 · 2026-11-10
- Nvidia lobbied hard against rules on remote access to restricted chips, officials say — rohanpaul_ai · 2026-11-10
- AI daily: Fable 5.2 tops evals, orchestrates 1000 agents for 8 days to build a prototype OS — jiqizhixin · 2026-11-10
- Engineer calls megakernel hype a psyop: CUDA graphs already express a strict superset — mike64_t · 2026-11-10
- Senate advances energy permitting bill 73-25, requiring data centers to pay more grid costs — firstadopter · 2026-11-10
- vLLM adopts LibTorch Stable ABI: PyTorch upgrades no longer require rebuilds — vllm_project · 2026-11-10