E2E Networks to add ~5.4MW for NVIDIA HGX B300, lifting capacity to 14.6MW
cneuralnetwork · x · 2026-10-26
Indian GPU cloud provider E2E Networks said in an exchange filing it proposes to expand capacity by 5.4MW for NVIDIA HGX B300 systems and other GPUs, taking total capacity to 14.6MW if fully implemented, guided by its infrastructure deployment plan and anticipated AI computing demand — a sign India's GPU infrastructure buildout is heating up.
Related event: India ramps up AI compute as E2E Networks plans expansion to 14.6MW(2 posts)→
More from Infra
- Sail equivalence proof and riscv-coq cross-checks uncover real RISC-V spec bugs — xennygrimmato_ · 2026-10-27
- xAI's Colossus 1 hits ~14.6 exaflops FP64, ~5x Top500 leader — cis_female · 2026-10-27
- Lambda runs 19 B200 nodes in a 16-node power budget, boosting throughput 24% — TheZachMueller · 2026-10-27
- Podcast: Micron's HBM roadmap, Meta's AI infra, and NVIDIA's supply chain lock-in — BenBajarin · 2026-10-27
- SGLang MegaKernel + PD Pushes the TCO-Latency Frontier on GB300, SemiAnalysis Benchmarks Show — AccBalanced · 2026-10-27
- Scaling self-hosted Convex: compiling TypeScript Convex functions to WASM — leventov · 2026-10-27