Optimus V4 to be built at new Giga Texas factory in late 2027, 10x Fremont capacity
PTrubey · x · 2026-10-26
In a podcast with @herbertong and @GoingBallistic5, plus PTrubey's addition: V4 Optimus will be built at the new giant Giga Texas factory (due late 2027) with high vertical integration, meaning a much smaller supply-chain problem even as volumes are expected to be 10x what Fremont can build.
More from Companies & People
- Anti-AI-slop startup Taste goes on hiring spree for taste, evals and RL talent — korymath · 2026-10-26
- Ruff creator on quality: 'Caring is the moat' — by the time data shows it, it's too late — charliermarsh · 2026-10-26
- Claude's mobile MAU up ~79x in two years, far outpacing ChatGPT's 3.6x on indexed charts — sr_local · 2026-10-26
- Google XR Labs opens student researcher and intern applications for 2027 — DuRuofei · 2026-10-26
- MAIN 2026 Montreal: V-JEPA 2 interpretability lecture and build-world-models-from-scratch tutorial — soniajoseph_ · 2026-10-26
- a16z partner calls out Strava and Runna for lacking basic AI integration — saranormous · 2026-10-26