Tesla Megapack Nearly Sold Out Through 2027 as AI Data Centers Drive Extreme Demand
XFreeze · x · 2026-10-23
Tesla's Q3 earnings call made clear that the AI data center boom is turning into an energy infrastructure boom:
- Elon Musk: "We're actually almost sold out of all Megapacks for 2027," and expects Megapack gross margins to increase meaningfully
- CFO Vaibhav Taneja highlighted "extreme demand from data centers," with higher average selling prices expected as production expands
- Manufacturing: California Megafactory 40 GWh/yr, Shanghai 20 GWh/yr, Texas 50 GWh/yr — 110 GWh combined annual capacity, deployed in 65+ countries
- 13.7 GWh of energy storage deployed in Q3 alone
Megapack is built for fast deployment, massive storage, and grid stabilization to absorb the fluctuating power demands of modern data centers.
More from Infra
- Lovable, with 70M AI-generated apps, migrates from Next.js to TanStack Start on Cloudflare Workers — irvinebroque · 2026-10-24
- Micro1 builds petabyte-scale robot training data delivery with Hugging Face and Cloudflare — k7agar · 2026-10-24
- AI stocks slide but server memory and GPU rental prices are still up 15% in a month — tengyanAI · 2026-10-24
- Virtual Head Attention: 4x smaller KV cache, beats GQA on long context (RULER 84.4 vs 73.0) — pmttyji · 2026-10-23
- Oxide's switch was so controversial most investors said 'I'm out' — Sethwinterroth · 2026-10-23
- TensorSharp hits 4.4–5.5x llama.cpp prefill throughput on DeepSeek V4.1 Flash with 5x A40 — fuzhongkai · 2026-10-23