Microsoft receives first production Vera Rubin chips at data centers
satyanadella · x · 2026-08-22
Satya Nadella announced that the first production units of Nvidia's Vera Rubin GPUs have arrived at Microsoft data centers. He thanked partners at Nvidia and the Azure hardware and datacenter teams for reaching this milestone.
Related event: Microsoft Datacenters Receive First Production NVIDIA Vera Rubin GPUs(3 posts)→
More from Infra
- NVIDIA releases Nemotron 3.5 Bolt 74B MoE that fits in 24GB VRAM at 2-bit — NerdyRodent · 2026-10-16
- Analyst: 80% of neoclouds may not survive, but the demand for their GPU capacity is real — BenBajarin · 2026-10-16
- Apple and Meta partner to run Muse Spark model on linked Mac Studios — pdamodaran · 2026-10-16
- Nvidia's developer base hits 11 million, up ~3.7x from 3 million in 2021 — Beth_Kindig · 2026-10-16
- Muse Spark Open runs locally on a Mac M3 Ultra via llama.cpp: frontier model on desktop — pcuenq · 2026-10-16
- Muse-Spark open-weights drop: 816B-A42B MoE model gets 359GB MLX 3-bit build — ns123abc · 2026-10-16