Modeling mistake wastes $12B of US ratepayers' money in PJM grid

_delirium · hn · 2026-08-17

A report by SemiAnalysis reveals that a modeling error within the PJM Interconnection (the largest US power grid) has led to approximately $12 billion in wasted costs for US ratepayers. This incident highlights the immense economic sensitivity of model accuracy in energy system planning.

Original post →

More from Infra

Infra channel →