SK hynix says HBM4 ramps should lift DRAM ASP in the second half, with mass production in 2026
tengyanAI · x · 2026-07-29
SK hynix said its Q2 DRAM ASP came in below expectations mainly because of product mix, not pricing pressure.
- Shipments of some high-value products were deferred into the second half, which dragged down blended DRAM ASP.
- Management expects stronger DRAM ASP in H2 as HBM4 shipments ramp, 1c DRAM shipments increase, and value-added DRAM takes a larger share.
- In the Q&A, SK hynix said HBM4 mass production is planned for 2H 2026, with volume production in 2027; yield and quality are expected to be near HBM3E levels for key customers.
Related event: SK Hynix Confirms HBM4 Mass Production in H2 2026(5 posts)→
More from Infra
- Unsloth Desktop Hotfix Adds Qwen-Image-2.1 Image Editing and Fixes GGUF Loading — danielhanchen · 2026-09-23
- Qwen 3.6 35B-A3B Q6 hits ~50 tok/s on a 128GB Strix Halo — what's the best local model now? — jankeydankey · 2026-09-23
- Together AI adds canary rollouts for zero-downtime model upgrades on dedicated inference — togethercompute · 2026-09-23
- Dedicated Hardware for Running AI Agents at Scale Arrives — cyrilzakka · 2026-09-23
- Ternary Bonsai 2 27B: 5.9GB weights retain ~95% of full-precision reasoning — cephaloform · 2026-09-23
- Qwen 27B runs 24hr unattended on one RTX5090, builds full Postgres-SpringBoot-React spreadsheet app — anglepoiselife · 2026-09-23