HBM generational upgrades bottlenecked by DRAM process tech

ohlennart · x · 2026-07-14

The repost points out that manufacturers must advance DRAM processes to produce next-gen HBM. CXMT has currently only announced mass production at the 1z node, whereas HBM3E previously required the 1α node. This is difficult without EUV, but not entirely impossible.

Original post →

More from Infra

Infra channel →