Nvidia Kyber NVL144 Rack Delayed Over 12 Months
vikramskr · x · 2026-07-07
According to a SemiAnalysis article published on July 6, the midplane design of Nvidia's Kyber NVL72x2 rack is critical. The NVL144 rack has been delayed by over 12 months—pushed from 2027 to 2028—due to manufacturing difficulties with the PCB midplane. The article suggests that all technological paths will eventually converge on the CPO (co-packaged optics) solution.
Related event: Nvidia Denies Kyber NVL144 Rack Delay Rumors(3 posts)→
More from Infra
- Sail equivalence proof and riscv-coq cross-checks uncover real RISC-V spec bugs — xennygrimmato_ · 2026-10-27
- xAI's Colossus 1 hits ~14.6 exaflops FP64, ~5x Top500 leader — cis_female · 2026-10-27
- Lambda runs 19 B200 nodes in a 16-node power budget, boosting throughput 24% — TheZachMueller · 2026-10-27
- Podcast: Micron's HBM roadmap, Meta's AI infra, and NVIDIA's supply chain lock-in — BenBajarin · 2026-10-27
- SGLang MegaKernel + PD Pushes the TCO-Latency Frontier on GB300, SemiAnalysis Benchmarks Show — AccBalanced · 2026-10-27
- Scaling self-hosted Convex: compiling TypeScript Convex functions to WASM — leventov · 2026-10-27